Poster Type: ACM SRC Posters
Author: Shania Ziegler (Brigham Young University)
Abstract: Datacenters are exploring on-site small modular reactors (SMRs) for low-carbon power, but reactor power carries multi-hour state that conventional power scheduling does not capture. A power maneuver that is feasible when requested can become infeasible hours later as iodine–xenon dynamics evolve. We expose reactor feasibility through a runtime layer that checks the projected reactor state before the workload scheduler commits to a maneuver. Using eight Google Borg workload traces and PJM grid data, we evaluate reactor- and workload-aware policies at one-minute resolution. At low reactor margin, workload-aware scheduling without reactor state leaves 172 MWh unserved and averages 7.4 reactor shutdowns, while adding projected reactor feasibility reduces unserved work to 169 kWh with no shutdowns. Fixed recovery delays do not reproduce this behavior, and sensitivity experiments examine lookahead, enforcement margin, and reactor-model mismatch.
Best Poster Finalist (BP): no
Poster: PDF
Poster Summary: PDF